Consultancy Services Package – Road Improvement Development Project (RIDP)/III-05

PROJECT HIGHLIGHTS

Detailed Engineering Survey, Design and Preparation of DPR, Contract Packaging and Preparation of Bidding Documents and Construction Supervision of Upgrading/Improvement Works for:

  1. Gandak Canal Road (61.92 Km)
  2. Chandrauta-Krishna Nagar Road (20 Km) & Krishnanagar urban roads (8 Km)
  3. MRM-Gulariya-Rajanawa Road (29.99 Km) & Nepalgunj urban roads (21.04 Km)

FUNDING AGENCY: Export-Import Bank of India
DURATION: DECEMBER 2015 – JANUARY 2022
VALUE OF SERVICES: NRs 217,771,000.00 (excl. VAT) /  USD 2,047,104.00
LOCATION: Birgunj, Krishnanagar, Nepalgunj

The Government of Nepal (the GoN) has received a credit (Exim Bank’s Line of Credit (LOC) of US$ 1000.00 million to the GoN from Export- Import Bank of India towards the cost of purchase of eligible works, goods and services for Road Projects, Hydroelectric Projects and Irrigation Projects, and intends to apply part of the proceeds to eligible payments for road improvement project to be implemented by the Department of Roads (DoR). But consultancy services required for the same has to be procured through the budgetary provision by the GoN.

Towards achieving the Government’s policy to enhance and strengthen Strategic Road Network, DoR intends to upgrade the roads mentioned hereunder to all season Double Lanes/Four Lanes Black Topped standard. Those roads are:

  1. Gandak Canal Road (61.92 Km)
  2. Chandrauta-Krishna Nagar Road (20 Km) & Krishnanagar urban roads (8 Km)
  3. MRM-Gulariya-Rajanawa Road (29.99 Km) & Nepalgunj urban roads (21.04 Km)

For procurement of the consultancy services for the above works, an agreement was signed under Contract No: RIP –III-5/3371334/CS-005/71/72 between GoN and SILT Consultant Pvt. Ltd – Material Test Pvt. Ltd JV on 2 December, 2015. After completion of Design phase, supervision phase has been started since February 2019.

The services to be provided by the Consultant in the Project are:

  • To provide complete construction supervision/ contract administration of the above road,
  • Upgrading/Improvement works including post construction supervision during the defects liability period.
  • To supervise the construction done by the contractor contractually so that required qualities and quantities shall be delivered within the stipulated time frame effectively and efficiently.

Major Projects

  • Design and Construction Supervision of Araniko Highway Project – Phase I, II & III
    Transport
    Road

    Design and Construction Supervision of Araniko Highway Project – Phase I, II & III

  • Bagmati Area Physical Infrastructure Development Project Survey, Design and Construction Supervision of Integrated Urban Infrastructure-Landscape Design and Implementation, River Training Works, Sewer Lines and Access Roads
    Transport
    Road

    Bagmati Area Physical Infrastructure Development Project Survey, Design and Construction Supervision…

  • Construction Supervision of Aircraft Parking Area at Tribhuvan International Airport (TIA)
    Transport
    Airport

    Construction Supervision of Aircraft Parking Area at Tribhuvan International Airport (TIA)

  • Detailed Engineering Survey and Design of Electrified Railway Line of Mechi-Mahakali Electrified Railway
    Transport
    Railways

    Detailed Engineering Survey and Design of Electrified Railway Line of Mechi-Mahakali Electrified Rai…

  • Transport Project Preparatory Facility (PPPF)
    Transport
    Road

    Transport Project Preparatory Facility (PPPF)