Bagmati Area Physical Infrastructure Development Project Survey, Design and Construction Supervision of Integrated Urban Infrastructure-Landscape Design and Implementation, River Training Works, Sewer Lines and Access Roads

PROJECT HIGHLIGHTS

BAGMATI AREA PHYSICAL INFRASTRUCTURE DEVELOPMENT PROJECT SURVEY, DESIGN AND CONSTRUCTION SUPERVISION OF INTEGRATED URBAN INFRASTRUCTURE-LANDSCAPE DESIGN AND IMPLEMENTATION, RIVER TRAINING WORKS, SEWER LINES AND ACCESS ROADS

FUNDING AGENCY: Government of Nepal
DURATION: JANUARY 2016 TO SEPTEMBER 2018
VALUE OF SERVICES: NRs 44,533,000.00 / USD 422,033.00
LOCATION: BAGMATI CORRIDOR FROM TILGANGA TO CHOVAR, KATHMANDU

Bagmati River and its tributaries are drawing attention of various organizations towards its problems. Though there are several organizations working for the conservation of Bagmati and its tributaries, there was not any tangible benefit. This is due to lack of proper coordination and proper directive to guide and define the works of each organization in conserving Bagmati Civilization. In view of this, the Government of Nepal has formed a High Powered Committee for Integrated Development of Bagmati Civilization (HPCIDBC) for the purpose of keeping Bagmati River and its tributaries clean and free from contamination and pollution by preventing direct discharge of solid and liquid wastes to the river. It thus envisages conserving the Bagmati Civilization. The expected outcome of the project will be to reincarnate the Bagmati River and its tributaries with an increased access to better urban services for the people of the capital city. Construction of sewage treatment plant at Guheswori and a sewer tunnel to bypass treated/untreated sewage directly to the river and access roads, sewage pipelines and river training works on both side of the Bagmati River are the major activities of the Project. The main component of the Project works is design and construction of river training works, sewerage lines and road works on the both side of Bagmati River from Tilganga to Chovar (12 Km), Bishnumati Corridor from Bagmati- Bishnumati Confluence to Mahadev Khola(6 km) and Bagmati-Dhobikhola Confluence to Gopi Krishna Cinema Hall(12 KM).

The services to be provided by the Consultant in the Project comprises of the main three components:

  1. Detailed Design and Construction Supervision of Sewerage ,River Training and Road Works
  2. Design of New Contract packages
  3. Design Review of New Contract packages

Major Projects

  • Design and Construction Supervision of Araniko Highway Project – Phase I, II & III
    Transport
    Road

    Design and Construction Supervision of Araniko Highway Project – Phase I, II & III

  • Construction Supervision of Aircraft Parking Area at Tribhuvan International Airport (TIA)
    Transport
    Airport

    Construction Supervision of Aircraft Parking Area at Tribhuvan International Airport (TIA)

  • Consultancy Services Package – Road Improvement Development Project (RIDP)/III-05
    Transport
    Road

    Consultancy Services Package – Road Improvement Development Project (RIDP)/III-05

  • Detailed Engineering Survey and Design of Electrified Railway Line of Mechi-Mahakali Electrified Railway
    Transport
    Railways

    Detailed Engineering Survey and Design of Electrified Railway Line of Mechi-Mahakali Electrified Rai…

  • Transport Project Preparatory Facility (PPPF)
    Transport
    Road

    Transport Project Preparatory Facility (PPPF)