Feasibility and Environment Impact Assessment Study of Arun-4 Hydropower Project (490 MW)
The proposed Arun-4 Hydropower project with an installed capacity of 490 MW is Run of the River type project located in the Sankhuwasabha District.
The proposed Arun-4 Hydropower project with an installed capacity of 490 MW is Run of the River type project located in the Sankhuwasabha District.
Kulekhani III Hydroelectric project with an installed capacity of 14 MW (annual energy generation of 40.85 GWh) is a cascade scheme of Kulekhani storage project (Kulekhani I and Kulekhani II Hydroelectric project, generating 60 and 32 MW peaking power, respectively).
The Chameliya Hydroelectric Project is proposed on Chameliya River in Darchula District of the Far-western Development Region of Nepal.